|
|
Towel Bar With Bins
|
| Towel Bar With Bins Construction | Diagram | Frame | Bins |
| Handles | Finished | Another Cab with Bins |
| |
>
| |
|
H = 8", W = 9-3/8"
| |
| Frame pieces cut out, bottom shelf grooved, stop bars glued to top shelf. |
| Close pic of bottom shelf groove. This is the pivot point for the tilt out bins. |
| Biscuit slots cut, 5/8" bar blind holes drilled. Ready to glue. |
| Being glued. The ClampIts keep everything square while the glue sets. |
| Frame ready for paint. |
| Closer look at groove in bottom shelf after the frame is glued. |
| Bin sides cut out. |
| 3 sets of fronts, sides, backs, and bottoms ready to glue. |
| Closer look at mitered edges. |
| Gluing one side to the bottom. |
| Second side being glued to bottom. |
| Closer look at side and back miters where back will be glued. |
| Back being glued on. |
| Two bins with fronts glued. |
| Close look at mitered lower back corner joints after gluing. |
| Glued bin. |
| Bin test fit into frame. |
| Tilt out test, OK. |
| A 2x4 has been ripped into 1-1/;2" X 1-1/2", then the edges rounded on the router table. For more pics please see my Handles and Pulls Page. |
| Bins and frame being painted. |
| From the other side. |
| Finished towel bar with Tilt-out Bins. |
| With bin tilted out. |
| Closer look at bin tilted out. |
| Or you can pull them out and take it to where the contents are needed. |
| With multiple bins in use. |